I Almost Chose the Cheaper LED Scoreboard. The Daktronics Price List Changed My Mind.
On a Tuesday night in September 2024, the old LED screen scoreboard at our arena flickered twice and went dark. We had a community basketball tournament the next morning, and the clock operator was ready to play the game with a stopwatch and a stack of paper scorecards. That was the night I learned you don't just buy a display. You buy a system.
Six weeks later, I was in the conference room with our general manager, two vendors, and a spreadsheet that made no sense. One quote was noticeably lower. The other was Daktronics. My gut said go low. My TCO spreadsheet said wait.
I Thought I Had Procurement Figured Out
When I first started managing the AV and signage budget at our events company (about $120k a year, if you're curious), I assumed the lowest quote was always the smartest buy. I have every order from the past six years logged in our cost tracking system, and I used to be proud of how many numbers I could squeeze. It took six years, around 40 vendor bids, and one very scary installation to unlearn that.
My first mistake was treating an LED screen scoreboard like a commodity. From the outside, a scoreboard is just a scoreboard: numbers, colors, a clock. The reality is the hardware is maybe half the project. Mounting structure, power, signal routing, control software, training, and long-term support can cost more than the display itself. But I didn't understand that until I saw what a Daktronics price list actually includes.
The Daktronics Price List Is Not a Menu
So what does a Daktronics price list look like? Honestly, it doesn't look like a list. As of early 2025, Daktronics doesn't publish a simple public menu. Every project gets a custom quote. I didn't love that at first. I like comparing exact numbers side by side. But a custom quote also tells you something: they are treating your install as an engineering project, not a box-moving exercise.
Our quote was split into hardware, control system, installation, structural engineering, and training. The lower bid was basically one line item: display. Why does that matter? Because every missing line item means another email to the vendor later, and usually another invoice.
Here's a concrete example. The Daktronics quote included a structural engineer inspecting the mounting area. The lower bid didn't mention it. At first, I thought Daktronics was padding the quote. Turned out, that line item saved us from a major problem. More on that in a minute.
The Cheaper Bid Was Not Cheaper
I'm not going to name the other company. The problem wasn't the company. The problem was the scope. Their number looked great on paper. But when I started checking the details, I saw installation not included, software setup separate, and structural engineering listed as an optional add-on. The Daktronics quote was higher, but it bundled the things that actually matter.
Our procurement team built a TCO spreadsheet and compared the two options over five years. We included installation, training, content creation, energy use, and a service plan. The lower bid became less impressive. Over five years, it was about 11% more expensive than Daktronics because we would have had to buy the missing pieces separately, plus a maintenance visit that the support contract would have covered. That's an 11% difference hidden in fine print, and I almost missed it.
This is the part where cost-control people will understand me: I wasn't trying to be the hero. I just wanted a number I could defend to the finance committee. The Daktronics quote was easier to defend because it covered the full system. The cheaper quote would have been a long series of 'oh wait, that costs extra' emails. I've learned the hard way that those emails are expensive.
What Daktronics Products Actually Include
We ended up installing a Daktronics LED screen scoreboard in the arena. We also priced a video LED screen for the lobby at the same time. Daktronics makes a lot of display products: indoor and outdoor scoreboards, video LED screens, digital signage, and even swimming timing systems. The range is broad, but the quote never felt like 'we can do everything.' It felt like 'here is what we are great at, and here is exactly how it connects to your existing setup.'
One example stuck with me. Their rep told us, 'If you just need a static sign, you do not need our video LED screen. Work with a digital signage software provider in Charlotte for that.' I almost didn't believe them. But that honesty made me trust them for the bigger stuff. The vendor who knows their limits is easier to trust than the vendor who says yes to everything.
We did work with a digital signage software provider in Charlotte for the lobby wayfinding displays. That was the right call. Daktronics handled the scoreboard and the big video LED screen; the local software partner handled content scheduling and integration with our calendar. Basically, everyone stayed in their lane, and the install went smoothly.
The Turning Point: Structural Engineering
The real proof came a few weeks later. The arena had an old steel support column near the board position. The lower bid had assumed the concrete pad was level and strong enough. Daktronics' structural engineer flagged it during the pre-install inspection. We had to pour a small foundation extension. That cost us about $2,800 extra. It stung. But if we had gone with the lower bid, we would have discovered the problem after the pole was up. That could have been a $20,000 mistake, not counting the schedule delay.
That was the moment I stopped looking at the upfront price and started looking at the total cost. I built a cost calculator after getting burned on hidden fees twice, and this was the third time it paid for itself.
We get quarterly invoices for the service plan now, and the line item makes budgeting easier. No surprise after-hours calls. Daktronics didn't promise us 100% uptime, but they did promise a clear response time. That was enough for us.
What I Learned (the Hard Way)
I don't want this to sound like a sales pitch. There are projects where Daktronics is not the right fit, and that's fine. But for a sports venue that runs events every week, the proof is in the operations. Our LED screen scoreboard has run for over a year without a single display issue. The video LED screen in the lobby runs every day. Software updates are scheduled, remote support is responsive, and our annual maintenance costs are predictable.
If you're working through your own Daktronics price list, here are four things I'd tell you:
- Look for what's not in the quote. A bid without installation, training, and structural engineering is not a price. It's a teaser.
- Ask for references. Daktronics gave us spec sheets, case studies, and site visits. If a vendor can't substantiate its claims, walk away. Per FTC guidelines, claims have to be truthful and backed by evidence, but you still need to check.
- Put every quote in a TCO model. It took us three hours to find an 11% difference hidden in the details. That's three hours well spent.
- Trust the vendor who says 'not our strength.' That's rare. It also means the things they do say you can believe.
At the end of the day, I still shop for price. I just don't buy on price alone. The Daktronics price list taught me that the real price is the scope, the support, and the risk. And if you ask me, that's worth paying for.